Finished architectural shingle roof after a full roof replacement by KTN Roofing

Full Roof Replacement

Complete tear-off and roof replacement, start to finish: old shingles stripped, decking repaired, dry-in, and a brand new architectural shingle roof with fresh flashings and vents.

Start to Finish

The job, in order.

Follow this project chronologically, from bare decking to the finished roof.

Tear-off begins: stripping the old shingles down to the decking, starting at the ridge.
The roof stripped to bare decking, with the last of the old shingles coming off.
Decking cleaned and inspected, with the ridge opened up for proper ventilation.
Dry-in underway: underlayment going down with new shingles, vents, and flashings staged.
The roof fully dried in and protected, ready for shingle installation.
New architectural shingles going down across the roof.
Detail of the finished field: new skylight, vents, and pipe flashings all sealed in.
The completed roof: new ridge caps, clean lines, and a roof built to last.

Want this done on your roof?

From tear-off to skylights, KTN handles the whole job with our own crew. Estimates are always free.